German TUV Mark certification

German TUV Mark certification

 

1 Abief introduction


  The full name of TUV Bauart Mark is the German electrical appliances and components safety certification Mark, also known as the type approval Mark or TUV Mark, which has a very high degree of recognition in the EU market. Suitable for electrical parts, such as power supply, transformer, dimmer, relay, connector, plug, wire and other mechanical parts and sports equipment parts. It's commonly known as the TUV logo. The TUV logo is different for each TUV company. Among them, TUV Rheinland is the most widespread. Its test method is also more demanding, through the extraction of second-tier brand-name products in the EU market for comparative testing, the overall test performance must reach the average level of all the comparative test products, and the single test must also be higher than the average test level, in order to pass the test and issue the TUV-mark certificate and logo. Through this certification to enhance the competitiveness of the product market has an important guiding significance.
image.png
  
        The TuV Bauart mark indicates that the product has passed independent testing and factory audits by TUV Rheinland or TUV SUD, certifies that the product meets the safety requirements of the relevant European or international standards, and is subject to regular production process reviews. The TUV Bauart logo is widely recognized by manufacturers and national certification bodies in Europe and around the world.

 

TUV Bauart Mark can help component manufacturers prove the safety of their products, making their products more competitive in the market and attracting buyers to purchase this product. At the same time, parts buyers can also use the TuV Bauart logo to ensure the safety of purchased parts and products, saving delivery cycles and additional testing costs.
        Generally speaking, TUV can issue TUV Bauart certificates, but also can issue other certificates, such as CE, FCC, CB. TUV's CB certificate in Europe and the world is very professional and authoritative, in the process of machine certification, where the TuV logo components are exempt from inspection. TUV Bauart certificate is a continuation of the German GS certificate, GS is the complete machine certificate, parts often in the hands that can not issue GS certificate will choose TUV Bauart certificate as a substitute, its authority is comparable to GS certificate.

 

Due to TUV's authority in the field of electronic and electrical appliances, its CB certificate and other electronic and electrical certificates are more expensive. Non-european countries can apply for the corresponding product certification through third-party agents or directly from TUV Rheinland and TUV SUD.
  
2The need for TUV Mark Certification (Benefits of applying for TUV Mark Certification)
1.
<!--[if mso & !supportInlineShapes & supportFields]> SHAPE  \* MERGEFORMAT <!--[if gte vml 1]> <!--[if mso & !supportInlineShapes & supportFields]> Always valid

2, can show the unique characteristics of the product

3, can be combined with one or more product characteristics to declare

4, with the TUV mark, not only to ensure the safety and quality factors of the product, but also to provide other certification information, such as ergonomics. This increases the credibility of your products and makes purchasing decisions easier for buyers and consumers.

 
3 Scope of TUV Mark certification

 

<!--[if !supportLists]-->1.      <!--[endif]-->aerospace

<!--[if !supportLists]-->2.      <!--[endif]-->Cars and transportation

<!--[if !supportLists]-->3.      <!--[endif]-->Consumer and retail products

<!--[if !supportLists]-->4.      <!--[endif]-->Healthcare and medical devices

<!--[if !supportLists]-->5.      <!--[endif]-->infrastructure

<!--[if !supportLists]-->6.      <!--[endif]-->Manufacturing and industrial machinery

<!--[if !supportLists]-->7.      <!--[endif]-->Power and energy

<!--[if !supportLists]-->8.      <!--[endif]-->Rail transit service

<!--[if !supportLists]-->9.      <!--[endif]-->Real estate

<!--[if !supportLists]-->10.   <!--[endif]-->Sports, leisure and recreational facilities

<!--[if !supportLists]-->11.   <!--[endif]-->Communication products and information technology

<!--[if !supportLists]-->12.   <!--[endif]-->Energy efficiency
 

( 4 )TUV Mark certification and certification agency


TUV-RH TUV-SUD
 

( 5 )  TUV Mark certification process


1. Project planning stage

 

A. Customer provides product information

<!--[if !supportLists]-->B. <!--[endif]-->Determine the certification scheme of the product

 


2. Project implementation stage

A. The customer formally submits the application

B. Establish the project and designate the project engineer

C, technical meeting and annual factory inspection, prepare samples and technical data

D. Product testing

E. Whether it is passed (it needs to be rectified if it is not passed)

F. Engineers organize documents and submit reports

G. Enterprises applying for certification for the first time are subject to factory review

<!--[if !supportLists]-->H. <!--[endif]-->The issuing department will review the report and issue the certificate


3
Annual review stage
A. Whether the factory has passed the audit (failed, the factory needs to rectify)

 

<!--[if !supportLists]-->C. <!--[endif]-->Issue annual factory qualification certificate
 
( 6 )
Technical documents required for TUV Mark certification

<!--[if !supportLists]-->1.<!--[endif]-->Company business license

<!--[if !supportLists]-->2.<!--[endif]-->More than two samples

<!--[if !supportLists]-->3.<!--[endif]-->A copy of the inspection specification and inspection report of the incoming important safety parts (components)

<!--[if !supportLists]-->4.<!--[endif]-->Work instructions and inspection tables of IPQC inspectors

<!--[if !supportLists]-->5.<!--[endif]-->A copy of finished product testing specification and inspection report

<!--[if !supportLists]-->6.<!--[endif]-->Testing equipment list (your factory must have the IEC standard for the production of the specification of the equipment)

<!--[if !supportLists]-->7.<!--[endif]-->Korean product certification certificate and label (not required for initial review)

<!--[if !supportLists]-->8.<!--[endif]-->Spot inspection records of testing equipment

<!--[if !supportLists]-->9.<!--[endif]-->Foreign school certificate of testing equipment

<!--[if !supportLists]-->10.<!--[endif]-->Customer complaint handling rules and procedures and complaint handling record form

<!--[if !supportLists]-->11.<!--[endif]-->Quality system internal audit records

<!--[if !supportLists]-->12.<!--[endif]-->Certification change control procedures
 
( 7
)、TUV Mark certified items to be tested
1. Working voltage; 2, failure test; 3. Impact test; 4, vibration experiment; 5. Impact test; 6, electrical clearance, creepage distance and insulation penetration distance; 7. Plug test; 8, protect the connection conductor resistance; 9, external wire terminal; 10, power line stress relief test; 11, electrical connection and fixing test; 12, leakage test; 13. Contact test; 14, energy hazard inspection; 15, limited power supply test; 16, safety interlocking device test; 17, printed circuit board test; 18, power supply protective cover; 19, packaging and sealing parts inspection; 20. Electric shock test; 21. Electrical equipment in the building (top); 22, electric shock test; 23, dielectric strength test; 24, label inspection and test; 25. Radiation test; 26, temperature rise test; 27. SELV test; 28. TNV test; 29, current limiting circuit test; 30, overload test; 31, manual device test; 32, battery explosion-proof test; 33, overflow test; 34, combustible experiment; 35. Input test
 
Test items vary according to actual samples and sample application standards.
 
8 TUV Mark certification period and validity period
Cycle: usually 4-5 weeks, can be expedited, and additional charges will be paid
 
9 )  TUV Mark Certified factory review and other considerations
A. Company organization chart

B. Organization chart of quality control department

C. Quality assurance system

D. Production flow chart (from purchase to shipment and payment)

E. Incoming material inspection flow chart and corresponding inspection documents (incoming material inspection receipt, return sheet, inspection report, partner factory history record, partner factory assessment form, partner factory abnormal quality contact sheet, special application form, warehouse purchase list, inventory control card, purchase daily report)

F, incoming inspection standards, sampling standards, AQL level, inspection methods (especially key components and key dimension inspection) content and records; Products to be tested, qualified products and waste stacking and labeling;

G, first/last part inspection (item, standard, defect classification, time, record, disposal plan)

H, process (production) inspection flow chart and related documents (project, standard, defect classification, time, inspection result, record, evaluation, disposal plan, signature)
I, operation instructions, key operation inspection, product improvement process

J, inspection items, standards, defect classification, time, record, disposal plan

K, finished product/packaging inspection items, standards, defect classification, time, record, disposal plan

L, 100% safety inspection

M, warehouse inspection items, standards, work instructions, defect classification, time, record, disposal plan

N, the warehouse parts are stacked and labeled normally, the process of receiving materials; Storage conditions (temperature, temperature, roominess, etc.)

O, shipment inspection

P, staff training records, inspection personnel training records,

Q, material requisition, storage management, shipment order, scrap order, return order, inventory order

R, production line semi-finished products, finished products, defective products regional division

S, measuring instruments appraisal account, appraisal certificate

T, functional testing of measuring tools

U, regular inspection of equipment
V, certification product consistency change procedure file

W, nonconforming product processing procedures

 

TOP