North America Certification
Position: Home > International Certification > North America Certification
United States UL certification process
United States UL certification process
1, the applicant fill in the
UL certification pre-application form, the application form, product
instructions and technical documents together fax or send to us.。
2. The technical documents to be provided by the
applicant include:
a, product instructions.
b,
safety design document (including key structure drawing, that is, can reflect
the climbing distance, clearance, insulation layer number and thickness of the
design drawing)
c,
product technical conditions (or enterprise standards).
d,
product electrical schematic diagram.
e.
Product circuit diagram.
f. List
of key components or raw materials (please select products with UL
certification mark).
g,
machine or safety components/raw material certification copy.
h, Description/Related
information - Specify the product name and its intended use, including model
number, appropriate series description and list. If the same product of
different models is applied at one time, the differences and similarities
between the other models and the specified prototype should be detailed, which
helps to reduce the test time and reduce the test cost.
3, according
to the information provided by the applicant (in English) (if you need to apply
for CUL mark at the same time, please indicate), UL will determine the
corresponding test standards and make a quotation (excluding the cost of the
first factory inspection).
4. If
the applicant accepts the quotation, sign back the quotation.
5. UL
issues formal Agreements.
6,
carefully read and sign back the application form and tracking service
agreement, and pay the test fee (US $) and test or agent fee (RMB) as required.
Send/deliver samples to designated laboratory as required.
7, product inspection, if
the product does not meet the requirements, UL certification body will notify
the applicant, explain the non-conformity, the applicant needs to decide to
change or send samples again.
8, we
hope customers can buy UL standards, so that you can understand the
requirements of the UL certification body.
9, after
the product test is qualified, the UL certification body inspection department
will visit the factory to determine whether the production meets the procedural
requirements (IPI). If IPI is approved, the applicant can ship the products
bearing the UL mark.
10, UL certification body
inspection department will visit regularly to help your company's listed
products continue to meet the safety requirements of UL certification. Need to
pay: Factory inspection fee and certificate maintenance fee.
11,
Note: Components/raw materials list - Please provide a list of safety
components or materials used in your product, including the manufacturer's
name, model specifications, or other ratings, and whether it is approved or
listed by UL. We have provided a blank meta parts/raw materials list for your
reference.